Fabricating The Prosthetic Socket - Ottobock 4R220-1 Instrucciones De Uso

Ocultar thumbs Ver también para 4R220-1:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 44
5) INFORMATION: No PVA bag is required for fabricating a check
socket.
Soak the shorter PVA bag and pull it over the plaster model.
6) Use string to tie off the PVA bag in the undercut of the piston dummy
(see fig. 5).
7) Cut off the excess PVA bag with a scalpel.
8) Position the silicone dummy on the piston dummy. Check that no excess
PVA bag is protruding during this process (see fig. 6).
9) INFORMATION: Do not close the opening in the cylinder body from
the inside. Screw in the valve dummy after positioning the cylinder
body.
Position the cylinder body on the piston dummy. Perform the mediolater­
al alignment of the exhaust opening taking into account the prosthetic
alignment.
10) Screw the valve dummy into the exhaust opening until the O-ring closes
the opening (see fig. 7).
11) Close the slot in the valve dummy with Plastaband.

5.2 Fabricating the prosthetic socket

5.2.1 Optional: fabricating the check socket
Recommended materials: ThermoLyn (e.g. 616T52* ThermoLyn rigid,
>
616T83* ThermoLyn clear), 616S5* BetaSil
1) Prepare for fabrication of the prosthetic socket (see Page 19).
2) Attach 2 strips of Plastaband lengthwise over the cylinder on both the
anterior and the posterior side. This makes it easier to remove the cylin­
der after the trial fitting (see fig. 8).
3) Attach a strip of Plastaband circularly over the proximal edge of the cylin­
der to seal the prosthetic socket (see fig. 8).
4) Complete the vacuum forming process.
5) Finish the prosthetic socket (see Page 22).
6) If the system leaks: seal the transition from the cylinder body to the
inside of the prosthetic socket with BetaSil.
5.2.2 Laminating the prosthetic socket
Required materials: 623T3=8 or 623T3=10 perlon stockinette, 81A1=8
>
or 81A1=10 nylon stockinette, 616B1=25x* carbon fibre cloth strap,
99B81=100X19X5 PVA bag, 617H119 Orthocryl lamination resin 80:20
PRO, string, 627B40 polyethylene adhesive tape
1) Prepare for fabrication of the prosthetic socket (see Page 19).
2) Cut 1 piece of perlon stockinette (2 times the length of the plaster mod­
el).
20

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

4r220 1 dynamic vacuum system

Tabla de contenido