1) Plug the charging station with power supply unit into the wall socket.
→ The green LED on the power supply unit and the green LED in the middle
2) Insert one or two rechargeable batteries into the charging station.
3) The green LED for the respective charging socket lights up
ging process starts.
4) When the rechargeable battery is fully charged, the green LED for the respect
ive charging socket flashes
5) Remove the rechargeable battery after the charging process is complete.
6.2.1 Display of the current charge level
When inserting/engaging the rechargeable battery in the prosthesis, a charge level indicator is
activated on the battery for a few seconds.
LED indicator
and
6.2.2 Troubleshooting
Charging socket LED for the
Empty
Empty or
rechargeable bat
tery inserted
Rechargeable
battery inserted
of the LED row light up.
Event
Charge level above 50%
Charge level below 50%
Charge level below 5%
Event
charging
socket
The battery charger is defective
or
or
The battery charger and power supply must be inspected by
an authorised Ottobock Service Centre.
The rechargeable battery is charging
The rechargeable battery is fully charged
The temperature of the rechargeable battery is too high
Remove the rechargeable battery and let it cool down
The inserted rechargeable battery is defective
The rechargeable battery must be inspected by an authorised
Ottobock Service Centre.
.
and the char
25