Descargar Imprimir esta página

Set Up Instructions - Marsh Electra Manual Del Propietário

Surtidor de cinta

Publicidad

Operation

Set Up Instructions

Loading the Tape
Figure 3
Figura 3
Press Here to Release
Measurig Wheel
Appuyez ici pour libérer
la roue de mesure
Presione aquí para liberar
la rueda dosificadora
Measuring Wheel
Roue de mesure
Rueda dosificadora
Cutter Blades
Lames du couteau
Navajas de la cortadora
Pressure Pad Plates
Plaques du tampon
de pression
Placas de la almohadilla
de presión
Tape
Bande de papier
Cinta
Feed Wheel
Roue d'alimentation
Rueda alimentadora
Before beginning operation of your new Electra, select a flat, stable surface within 7 feet (2.13m) of
a power source for the location. To prepare for operation, load the tape and prepare the moistening
system. Next, depending upon the type of tape you are using, make adjustments to the water level
and the pressure pad position. Finally, if it is necessary adjustments can be made to the measuring
wheel, the cutter blades, and the water temperature. (Details about these adjustments can be found
in the maintenance section.)
To load the tape in the Electra, refer to Figure 3 and follow the instructions below:
1. Remove the cover plate by lifting up on the back end.
2. Place the roll of tape in the receptacle so that the tape will unroll toward you with the adhesive
side down. Cut the tape with a knife or scissors to have a clean leading edge to feed through the
machine.
3. Adjust the tape receptacle using the thumb screw to center the roll of tape. Note: Sides of
receptacle should be close to roll of tape, while still allowing tape to roll freely.
Measuring Wheel Bracket
Crochet de la roue de mesure
Soporte de la rueda dosificadora
Turn to Adjust Receptacle Plate
Soulevez pour ajuster l'entretoise
Gire para ajustar la placa del receptáculo
Tape Receptacle
Entretoise
Placa separadora
Roll of Tape
Rouleau de papier
Rollo de cinta
Rear Tape
Roller
Rouleau de
bande arrière
Rodillo de cinta
posterior
9

Publicidad

loading