Fig.
Item
–
3
–
3
–
3
–
–
5 Preparing the product for use
CAUTION
Incorrect alignment, assembly or adjustment
Risk of injury due to change in or loss of functionality
Assembly, adjustment and maintenance operations may only be completed by qualified per
►
sonnel.
Observe the alignment, assembly and adjustment instructions.
►
5.1 Preparing the prosthetic socket
CAUTION
Using a wrong prosthetic socket
Contusions and pressure sores due to wrong socket fit
Use the vacuum pump only in combination with an ischial containment prosthetic socket with
►
corresponding end load.
Mounting the Vacuum Connector
► Mount the 2R119 Vacuum Connector on the prosthetic socket according to the applicable
instructions for use.
5.2 Bench Alignment
+ = anterior placement / – = posterior placement (in relation to the alignment reference
line)
Item
see fig. 1, see fig. 2
Required tools and materials:
662M4 Goniometer, 743S12 Heel Height Measuring Apparatus, 743A80
50:50 Gauge, alignment apparatus (e.g. 743L200 L.A.S.A.R. Assembly or 743A200
PROS.A. Assembly)
Position prosthetic components in accordance with the following values in the align
ment apparatus and install them in accordance with the instructions.
a–p positioning, middle of the prosthetic foot to the alignment reference line:
+30 mm
Heel height:
effective heel height (x) + 5 mm
Quant
Designation
no.
ity
–
1
Instructions for use
–
1
3R60 Vacuum
–
2
Tube
–
1
Filter
–
1
Cosmetic Exhaust Flange
–
1
Adjustment Wrench
–
1
Pyramid Dome Protector Kit
Bench alignment process
3R60 Vacuum
Article number
647G873=all_INT
3R60=VC
4X145
4X253
4Y383
710H10=2x3
2Z11=KIT
19