Descargar Imprimir esta página

Pentair Raychem JBS-100-A Instrucciones De Instalación página 3

Publicidad

Idiomas disponibles

Idiomas disponibles

5A
BTV and QTVR
• Push braid back to
create a pucker.
• At pucker use a screw-
driver to open braid.
• Bend heating cable and
work it through opening
in braid.
• Lightly score inner
jacket around and
down as shown.
• Peel off inner
jacket.
• Notch core.
• Peel bus wire
from core.
• Score core
between buswires
at inner jacket.
• Bend and snap core.
• Peel core from bus wire.
• Remove any remaining
core material from bus
wires.
• Pull braid tight to make
pigtail.
THERMAL MANAGEMENT SOLUTIONS
6 1/2 in
(165 mm)
1/4 in
(5 mm)
Go to Step 6
EN-RaychemJBS100A100A6-IM-H56046.pdf      03/13
5B
XTV and KTV
• Push braid back to
create a pucker.
• At pucker use a screw-
driver to open braid.
• Bend heating cable and
work it through opening
in braid.
• Lightly score inner
jacket around and
down as shown.
• Peel off inner jacket.
• Cut and remove
all fiber strands.
• Score and remove
center spacer.
• Remove any
remaining fiber
material from bus
wires.
• Pull braid tight to
make pigtail.
6 1/2 in
(165 mm)
Go to Step 6
3 / 8

Publicidad

loading

Este manual también es adecuado para:

Raychem jbs-100-a6Raychem a6