Descargar Imprimir esta página

Pentair Raychem JBS-100-A Instrucciones De Instalación página 5

Publicidad

Idiomas disponibles

Idiomas disponibles

6
• Mark the jacket
as shown.
8
• Push core sealer onto the heating cable to the mark made
in step 6.
Note: Extra force may be required for larger cables or at
lower temperatures.
10
• Slip the green/yellow tube onto the
braid. Heat-shrinking is not required.
• Trim bus wires and braid.
1/2 in
(13 mm)
THERMAL MANAGEMENT SOLUTIONS
5/8 in
(15 mm)
Make sure the bus
wires do not kink,
bunch, or crossover.
1/2 in
(13 mm)
EN-RaychemJBS100A100A6-IM-H56046.pdf      03/13
7
cAUTION: Health Hazard.
Wash hands after contact with sealant. consult
material safety data sheet vEN0033.
• If needed, re-twist and straighten bus wires,
then insert into the guide tubes as shown.
Make sure all strands
go into the tubes.
9
• Remove the guide tubes and
dispose of them in a plastic bag.
11
• Pull heating cable back into stand so 1 in (25 mm) is
exposed as shown. Use cable lubricant if needed.
Tubes
1 in (25 mm)
5 / 8

Publicidad

loading

Este manual también es adecuado para:

Raychem jbs-100-a6Raychem a6