Descargar Imprimir esta página

Pentair Raychem JBS-100-A Instrucciones De Instalación página 8

Publicidad

Idiomas disponibles

Idiomas disponibles

17
• Install conduit and fittings as shown.
To minimize loosening due to pipe
vibration, use flexible conduit.
• Pull in power and ground wires, strip
off 1/2 in (13 mm) of insulation and
terminate.
Power and ground wires
18
• Install lid.
• Apply insulation and cladding.
• Weather-seal the stand entry.
• Leave these instructions with the end
user for future reference.
NORTH AMERICA
Tel: +1.800.545.6258
Fax: +1.800.527.5703
Tel: +1.650.216.1526
Fax: +1.650.474.7711
thermal.info@pentair.com
Pentair, BTV, QTVR, XTV, KTV, JBS and VPL are owned by Pentair or its global affiliates. All other trademarks are the property of their respective owners.
Pentair reserves the right to change specifications without prior notice.
© 1997-2013 Pentair.
THERMAL MANAGEMENT SOLUTIONS
1/2 in
(13 mm)
EuROPE, MIddLE EAsT, AfRICA
Tel: +32.16.213.511
Fax: +32.16.213.603
thermal.info@pentair.com
EN-RaychemJBS100A100A6-IM-H56046.pdf      03/13
3/4 in locknut
Water tight
conduit seal
Conduit
Pentair Thermal Management
drain
recommends the use of a
conduit drain to prevent
water condensation build-up.
Weather seal
AsIA PACIfIC
Tel: +86.21.2412.1688
Fax: +86.21.5426.2917
cn.thermal.info@pentair.com
Make sure
conductors are
not exposed.
WWW.THERMAL.PENTAIR.COM
LATIN AMERICA
Tel: +55.11.2588.1400
Fax: +55.11.2588.1410
thermal.info@pentair.com
PN 789781-000
8 / 8

Publicidad

loading

Este manual también es adecuado para:

Raychem jbs-100-a6Raychem a6