Descargar Imprimir esta página

Pentair Raychem JBS-100-A Instrucciones De Instalación página 4

Publicidad

Idiomas disponibles

Idiomas disponibles

5c
• Push braid back
and bunch as tight
as possible.
• Lightly score inner
jacket around and
down as shown.
• Peel off inner jacket.
• Unwind heating
element, cut and
remove as shown.
• Lightly score
clear jacket
around and
down as shown.
• Bend heating cable
to break jacket at the
score then peel off
jacket.
• Push braid
forward. Use a
screwdriver to
open braid as
shown.
• Bend heating cable
and work it through
opening in braid.
• Remove insula-
tion from ends
of bus wires.
• Pull braid tight
to make pigtail.
THERMAL MANAGEMENT SOLUTIONS
VPL
6 in
(152 mm)
6 in
(152 mm)
1/2 in
(13 mm)
Go to Step 6
EN-RaychemJBS100A100A6-IM-H56046.pdf      03/13
4 / 8

Publicidad

loading

Este manual también es adecuado para:

Raychem jbs-100-a6Raychem a6