RK Rose+Krieger MonoLine R Instrucciones De Montaje página 101

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Assembling screw-in hubs
Fig. 25: Assembling screw-in hubs
Positioning the synchronisation
shaft
Fig. 26: Assembling the synchronisa-
tion shaft
Assembling the clamping hub
Fig. 27: Assembling the clamping hub
26.03.2019
Assembling optional modules > Assembling the synchronisation shaft
3.
Place the screw-in hubs (Fig. 25/2) on the timing belt shafts
(Fig. 25/1) of both linear units.
4.
Tighten 4 screws each (Fig. 25/3), alternating diagonally:
Size
40
60, 80, 120 M8
5.
Insert gear rings (Fig. 25/4) into the screw-in hubs.
6.
Loosely slide the following components onto the steel tube
(Fig. 26/4) one after the other:
n
2 clamping hubs (Fig. 26/1)
n
Protective tube (Fig. 26/2)
n
2 adapter flanges (Fig. 26/3)
7.
Position the steel tube (Fig. 26/4) with the loose components
between the screw-in hubs of both linear units.
8.
Slide clamping hubs (Fig. 27/2) into the screw-in hubs
(Fig. 27/1).
9.
Tighten the screw (Fig. 27/3) on each clamping hub.
Size
40
60, 80
120
Linear unit RK MonoLine R/RK MonoLine Z
Screw size
M4
Ensure that the clamping hubs on the steel tube
engage correctly in the screw-in hubs on the
linear units.
To reach the clamping hubs, move the protective
tube (Fig. 27/4) on the steel tube.
Screw size
M3
M6
M8
Assembly
Tightening torque [Nm]
4.2
40
Tightening torque [Nm]
1.4
10.5
25
101

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Monoline z

Tabla de contenido