3�3
Mains connection
The power source can be supplied by a motor generator. Follow the values indicated in table 1 when choosing the
motor generator power.
Item No
372
374
3�4
Lifting and transport
For lifting and transport methods, refer to Warnings Manual 3301151�
3�5
Installation and start up
The machine must be installed by professional personnel. All connections must be carried out according to current
regulations, and in full observance of safety laws (CEI 26-36 and IEC/EN 60974-9).
Make sure that the mains voltage matches the voltage indicated on the specifications plate of the power
source�
Connect a plug of adequate capacity for the current consumption I1 indicated on the data plate.
Make sure that the yellow/green conductor of the power cable is connected to the plug's earth contact.
The capacity of the overload cut-out switch or fuses, positioned between the power supply network and the power
source, must be adequate for current I1 consumed by the power source.
The power source is turned on and off using switch R.
3301065/A
Table 1
Motor generator power required
greater than or equal to 35 kVA
greater than or equal to 50 kVA
DANGER
WARNING
63/109