Establishing a connection to the user interface
7.3.1
Establishing a Direct Connection via Ethernet
Requirements:
☐ The product must be commissioned.
☐ A smart device (e.g. laptop) with an Ethernet interface must be available.
☐ The product must be connected directly to the smart device.
☐ The respective latest version of one of the following web browsers must be installed on the
smart device: Chrome, Edge, Firefox or Safari.
☐ The installer's SMA Grid Guard code must be available to change network-relevant settings
after the first 10 hours of feed-in operation, or after completing the installation assistant. You
can request the SMA Grid Guard code via the Online Service Center.
IP address of the inverter
• Standard inverter IP address for the direct connection via Ethernet: 169.254.12.3
Procedure:
1. Open the web browser of your smart device and enter the IP address 169.254.12.3 in the
address bar.
Web browser signals a security vulnerability
2.
After the IP address has been entered, a message might appear indicating that the
connection to the user interface of the product is not secure. SMA Solar Technology AG
guarantees the security of the user interface.
• Continue loading the user interface.
☑ The login page of the user interface opens.
7.3.2
Establishing a direct connection via WLAN
You have several options to connect the product to a smart device. The procedure can be different
depending on the devices. If the procedures described do not apply to your device, establish the
direct connection via Wi-Fi as described in the manual of your device.
The following connection options ar available:
• Connection with WPS
• Connection with Wi-Fi network search
Requirements:
☐ The product must be commissioned.
☐ A smart device (e.g. smartphone, tablet or laptop) must be available.
☐ The respective latest version of one of the following web browsers must be installed on the
smart device: Chrome, Edge, Firefox or Safari.
☐ JavaScript must be enabled in the web browser of the smart device.
Installation Manual
7 Commissioning
STP33-62-US-41-IA-xx-14
49

Publicidad

loading

Este manual también es adecuado para:

Stp 33-us-41Stp 50-us-41Stp 62-us-41Tripower core1-us stp 33-us-41Tripower core1-us stp 50-us-41Tripower core1-us stp 62-us-41