Descargar Imprimir esta página

CAMPAGNOLA MASTER Manual De Uso Y Mantenimiento página 44

Vareador eléctrico
Ocultar thumbs Ver también para MASTER:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 47
6.1.4
End of work maintenance
After use, or in the case of long periods of inactivity, it is prescribed to:
Follow the procedure for shutting down and securing the tool, above (see paragraph 5.4).
Follow all the maintenance instructions in the manual.
Extraordinary maintenance
6.2.1
General information
CAUTION!
Any extraordinary maintenance work must be carried out at a TAC.
TECHNICAL
IMPORTANT!
Grease recommended for greasing gears: PAKELO Multiplex EP grease NLGI2
Periodic maintenance schedule
Maintenance
Check that the screws are tightened correctly.
Check the cooling slots.
Check that the cable and connectors are intact.
Periodic overhaul to be carried out at a Manufac-
turer's Authorised Technical Assistance Centre.
Spare parts
Ways of ordering spare parts:
To place an order for spare parts, please contact your Local Distributor or Dealer or a Campagnola Srl Authorised
Service Centre, stating the quantity and part number of the part you wish to order.
The spare parts list is available on the Campagnola Srl website.
Alternatively, send a written request to:
Campagnola S.r.l.
Headquarters and Plant
40069 ZOLA PREDOSA (BO) Italy
Via Lazio, 21,23,23/A e 23/B
Tel. +39 051 753500
Fax. +39 051 752551
www.campagnola.it star@campagnola.it
specifying:
- machine serial number
- unit type as stated on the plate installed on the machine. If absent, please describe the piece
- part number (found in the component manual)
- description
- desired quantity
Page 44
ASSISTANCE CENTRES
hours of
Translation of the Original instructions Rev.: 00, Date 22/06/2023
After 8
After 100
hours of
work
work
X
X
X
0310.0419 Use and maintenance manual – Instructions
After 240 hours of work or
at the end of each working
season
X

Publicidad

loading