Descargar Imprimir esta página

Angelo Po 0N1FR1E Manual De Uso página 134

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

ENGLISH
All installation stages must be considered right
from production of the general layout.
Before starting these stages, as well as deciding
the place of installation, if necessary, the person
authorised to carry out these operations must
organise a "safety plan" to protect the people
directly involved, and he must also ensure strict
compliance with all legal requirements, espe-
cially those relating to mobile work-sites.
The place of installation must have all the con-
nections needed to supply the appliance and
dispose of the production residues, must be
suitably lit and must meet all legal health and
hygiene requirements to prevent the contami-
nation of the foods.
If necessary, fi nd the exact position of each in-
dividual appliance or subassembly and mark
the coordinates to place them correctly (see ex-
planatory diagram).
IMPORTANT: The unit is not suitable
for built-in installation.
WARNING: Do not install the unit
next to walls made of fl ammable material.
WARNING: Air inlets are required in
the room where the appliance is installed to
ensure a proper operation of the appliance
and to exchange the air in the room.
WARNING: The air inlets should be of
appropriate size, protected by gratings, and
placed so that they cannot be obstructed.
8
INSTALLATION OF THE APPLIANCE
ROOM VENTILATION
HANDLING AND INSTALLATION
min 100 mm
100
mm
min 100 mm
WARNING: Do not install the unit on
uneven, soft or sloped fl oors.
WARNING: Install at a distance of not
less than 100 mm from the walls (rear and/
or adjacent).
The installation must be in accordance with the
applicable legislation, regulations and specifi -
cations in the country of use.
3269930_inst_GB_rev.3

Publicidad

loading

Este manual también es adecuado para:

0t1fr1e0n1fr5e0t1fr5e1n1fr2e1t1fr2e1n1fr6e ... Mostrar todo