10.3. Checklist, installation requirements AC2500
Customer/
construction project:
Requirement
Required clearances in the installation room maintained
1
(see dimensioned drawing)
Installation location is frost-proof, dry, protected against the weather and well aerated and
2
ventilated
3
Installation surface is level
4
The load-bearing capacity of the installation surface is at least 1250 kg/m²
5
Floor drain present in the installation room
The pipelines have the following nominal widths:
Drinking water feed
Rainwater feed
Process water line
6
Grey water infeed
Overflow into sewer
Aeration and ventilation
7
Room temperature is 4 - 35° C
8
Only shower and bath water is fed in
9
Electrical connection present: 230V 50Hz TN-S (L, N, PE)
10
Residual current circuit breaker present, provided by customer
11
System infeeds are flushed
12
Anti-flooding valve present
13
Odour trap to the sewer present
Notes:
Date:
Version 1.3
DN 20 (¾˝)
DN 20 (¾˝)
DN 50 (2˝)
DN 100
DN 100
DN 70
Signature:
Operating Manual AquaCycle 2500
i.o.
EN 31