CEBORA S.p.A.
3 MAINTENANCE
WARNINGS
ANY INTERNAL INSPECTIONS OR REPAIRS MUST BE CARRIED OUT BY QUALIFIED PERSONNEL.
BEFORE BEGINNING MAINTENANCE OPERATIONS, UNPLUG THE POWER SOURCE FROM THE
MAINS AND WAIT FOR THE INTERNAL CAPACITORS TO DISCHARGE (1 MINUTE).
3.1 Periodic inspection, cleaning
Periodically open the grids on the power source and check inside the aeration
tunnel.
Remove any dirt or dust to ensure smooth air flow, and thus adequate cooling of the
internal parts of the power source.
Check the condition of the output terminals, output and power supply cables of the
power source; replace if damaged.
Check the condition of the internal power connections and connectors on the
electronic boards; if you find "loose" connections, tighten or replace the connectors.
3.2 Power source controls and signals.
3302336-B
49
20/12/2019