5.6 Networking devices
For Professional+ (PnC) 22 (T2S) versions only.
In "Networked" operating mode only.
Fig. 17: Ethernet connection
The devices have to be connected to a central router or
switch via the ethernet cable in order to connect several
devices to form a network. The wiring must be carried out
in star topology.
f Connect the central router or switch and the ethernet
surge protector (1) via an ethernet cable (2).
f Also connect the other devices to the router or switch.
Whenever an external energy meter is to be
integrated in the network for the purpose of load
management, then the device also has to be
connected to the router or switch via an ethernet
cable.
5.7 Setting up the device for three-phase
operation
This device is configured for three-phase operation when
delivered.
Setting the phase sequence relay
The potentiometer at both phase sequence relays must
1
be changed over to operate the device in single-phase.
L3 X
L2 X
L1 X
2
SOR74
1
3
N X
X 16
15 18
f Connect the device to single phase.
Î "5.4 Electrical connection"
f Adjust potentiometer (1) to position 1 using a slotted
screwdriver.
Setting
1
3
Reconnect the jumpers at the terminals of the power
supply
The jumpers at the terminals of the power supply have to
be reconnected for single-phase operation.
T
ATTENTION
Material damage as a result of incorrectly reconnected
jumpers
A short-circuit will occur whenever the jumpers are config-
ured for single-phase operation and the device is connect-
ed for three-phase operation. This can result in damage to
the circuit breakers in the indoor breaker box.
f Set up jumpers according to the device connection.
1
Description
Single-phase operation
Three-phase operation
EN
17