Conduct a test to ensure that there
are no gas leaks once the network
gate valve is open (Fig. 4).
Upon completion of the operations descri-
be, close the network gate valve (Fig. 3).
If it is necessary to replace the
nozzle to conform to another
type of gas supply, see the pro-
cedure described in the Operations
for commissioning (see chapter 5).
GAS TYPE CHANGE - see SECT.
IMAGES - REF. g)
The appliance comes from the
factory with setting to the type
of power indicated on the plate.
Any other configuration that changes
the parameters set must be authori-
zed by the manufacturer or by its re-
presentative.
The transformation from one
type of power to another must
THE PRESENT MANUAL IS PROPERTY OF THE MANUFACTURER. ANY REPRODUCTION, EVEN PARTIAL, IS PROHIBITED.
POWER SUPPLY CONNECTIONS
be performed by qualified technical
personnel authorized to perform the
operation in question. The correct
procedure to be implemented for the
transformation is described in the re-
levant manual.
mation must be requested directly
from the manufacturer.
appliance with new the parameters
reported on the adhesive document
provided.
gas attachment and one inside (see
image ref. g).
- 12 -
Injectors - By Pass - Pilot injec-
tors - Apertures - and anything
necessary for any gas transfor-
At the end of the transformation
from one type of power to
another, change the label on the
Two plates may need to be repla-
ced in certain cases (oven equi-
pment), one outside near the