Descargar Imprimir esta página

Checking The Impact Force; Starting Up; Final Checks; User Instruction - Erreka VIVO-D103 Manual Del Instalador

Cuadro de maniobra para el accionador izar
Ocultar thumbs Ver también para VIVO-D103:

Publicidad

Idiomas disponibles

Idiomas disponibles

Checking the impact force

6

STARTING UP

Final checks

Following installation and programming, start up the
operator and check the devices installed:
1 Check the correct operation of the key devices
(button, H.P. button, wall key and remote control).
See "Operation modes" on page 41.
2 Check the correct operation of the safety devices
(photocells).
See "A- Detection by additional safety device
(photocell or strip)" on page 42.
3 Place an obstacle and make the gate collide with it
in order to check operation in the event of collision.
See "B- Direct detection (sensitivity of the
operator)" on page 42.
4 Check that in connections with N.A. (Normally
Open) contacts, the corresponding LED diodes are
off whilst the connected devices are inactive.
5 Check that in connections with N.C. (Normally
Closed) contacts, the corresponding LED diodes are
on whilst the connected devices are inactive.
6 If everything is correct, close the panel cover.
If the system does not work correctly, find out
why and put it right (see section "Failure
diagnosis" on page 52).
F
< 400N
d
PROGRAMMING AND STARTING UP
1 Measure the impact force and compare it to the
values indicated in Standard EN12453:2000. If the
values measured are higher than those in the Standard,
reduce the torque or the speed (duly programme soft
startup and stop).
The torque regulator of the control panel must
be adjusted in a manner which respects the
values indicated in standard EN 12453:2000, as
shown
in
the
measurements must be made in line with the
method described in standard EN 12445:2000.

User instruction

1 Instruct the user with regards to the use and
maintenance of the installation and provide him/her
with the instructions on use.
2 Signpost
the
gate,
automatically and indicating how to operate it
manually.
Where
appropriate,
operation is using the remote control.
attached
chart.
The
showing
that
it
opens
indicate
that
VIVO-D103 / ADB30 Control Panel
51

Publicidad

loading

Este manual también es adecuado para:

Adb30