76
5-36
26
5-37
26
5-38
5-39
5-40
Operation
Fig. 5-36 Optimization "OP.2"
START is signalled on the screen.
Spinn the wheel.
A compensation run is performed.
The screen "OP.3" as shown in Fig. 5-37 is displayed.
Fig. 5-37 Optimization "OP.3"
Mount the tire correctly on the rim and inflate
to specified inflation pressure (make sure the
mounting guide rim of the tire is correctly seated).
Confirm by pressing menu key 26.
The Optimization "OP.4" screen (Fig. 5-38) is displayed.
Fig. 5-38 Optimization "OP.4"
(first measuring run of tire/rim assembly)
Clamp the wheel on the balancer.
Readjust the wheel such that the valve is exactly
perpendicular to and above the main shaft.
Enter the valve position by pressing menu key 26.
The Optimization "OP.5" screen (Fig. 5-39) is displayed.
Fig. 5-39 Optimization "OP.5"
START is signalled on the screen.
Perform the measuring run.
A measuring run is performed.
The Optimization "OP.6" screen (Fig. 5-40) is
displayed.