Descargar Imprimir esta página

Sun ECK NEXT 2020 Manual De Instrucciones página 41

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 362
MANUAL PROCEDURE
In the MANUAL PROCEDURE, all the operations can be performed singly to the exception of
the recovery/recycling phase, which is automatically followed by used oil discharge.
The values for the quantity of gas recovered, quantity of oil recovered, vacuum time, quantity of
oil reintegrated, and quantity of gas charged into the system are automatically printed at the end
of each single operation.
From the MAIN MENU:
Select the MANUAL PROCEDURE
RECOVERY
Connect the hoses to the A/C system with the quick-connect couplings, bearing in mind that
BLUE must be connected to the low-pressure side and RED to high pressure.
If the A/C system is equipped with a single quick-connect coupling for high or low pressure,
connect only the relative hose.
From MANUAL PROCEDURE, RECOVERY/RECYCLE, the following screen will be displayed:
INSTRUCTIONS MANUAL
, the following screen will be displayed:
MANUAL
RECOVERY/RECYCLE
VACUUM
OIL INJECTION
CHARGE
RECOVERY/RECYCLE
Connect and open HP and LP couplings
to A/C system and press ENTER
-40-
DD/MM/YY XX:XX PM
ESC
DD/MM/YY XX:XX PM
ESC
ENTER

Publicidad

loading

Este manual también es adecuado para:

Breeze iv