Descargar Imprimir esta página

M.J. MALLIS GROUP SIAT S2-S Manual De Instrucciones Y Recambios página 75

Precintadora automatica

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

7-INSTALLATION
7.10
MACHINE CONNECTION TO THE MAINS AND CHECK-OUT
Power supply = 0,240 kW
Maximum breaking power of the main switch =
For technical features of the main switch: see section 15-ENCLOSURES.
-Push the LOCKABLE EMERGENCY STOP BUTTON
-The magnetothermic main switch is normally turned OFF.
-Connect the cable supplied with the machine to a plug which complies with the safety regulations of yourcoun-
try.
7.11 CHECK-OUT OF PHASES
(FOR THREE-PHASE MAINS ONLY)
Procedure to be followed in order to connect correc-
tly the position of the phases:
-Remove any tools from the conveyor bed.
-Release the lockable emergency stop button tur-
ning it clockwise.
-Push button ON of the main switch.
-Check the rotation direction of the side drive belts.
-In case they rotate in the wrong way, please reverse
2 phases on the plug.
Correct rotation direction of the side drive belts.
January 2007
6 kA (230/400 V)
75
ENGLISH

Publicidad

loading