Turning The Machine On; Switching The Machine On; Preliminary Checks; Loading And Clamping The Wheel - SICE S 1000 Manual De Instrucciones

Ocultar thumbs Ver también para S 1000:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

5.1. TURNING THE MACHINE ON

Move the main switch to I (ON) position.
After turning on the machine, the RESET button
will appear on the display (Fig. 15).
Press to start the machine.

5.2. PRELIMINARY CHECKS

Check that there is a pressure of at least 8 bar on the Filter Regulator pressure gauge.
If the pressure is lower than the minimum level, some movements such as the rotation
of the tool holder head may not function correctly
Check that the machine has been adequately connected to the power mains.

5.3. LOADING AND CLAMPING THE WHEEL

User manual S 1000
- Load the wheel onto the lifter.
- Press the
the height of the turntable spindle (Fig. 16b).
16A
pedal (Fig. 16a) until it reaches
14
15
UK
16B
125

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido