SICE S 1000 Manual De Instrucciones página 131

Ocultar thumbs Ver también para S 1000:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

If necessary, operate the
the head further.
5- After hooking the bead, release the
button and stop the rotation.
6- Move the
wards to lift the demounting
tool until moving it above the
rim edge (Fig. 22d).
Facilitate the operation by using
the lower bead breaker disc:
operate the
lift the disc in order to move
the lower bead in the centre of
the well.
7- Ensure that the bead situated at 180° relative
to the tool is in the well, otherwise use the bead
pressing tool to facilitate positioning (Fig. 22e).
8- Turn the
User manual S 1000
22b
control to lower
lever up-
control to
selector (see Fig. 22f).
22c
22d
UK
22e
22f
131

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido