Installing The Mains Water Supply (Option); Connecting The Milk System; Commissioning Program - Schaerer Coffee Joy Manual De Instrucciones

Ocultar thumbs Ver también para Coffee Joy:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 153
www.schaerer.com
58
► Unpack the machine.
► Check the remaining package contents for accessories.
► Remove the accessories supplied in the grounds container and water tank.
Important: When operating the machine with a mains water supply, it is important that you
keep the provided internal drinking water tank. It is needed during the descaling process.
► Keep the original packaging in case the equipment needs to be sent back.

Installing the mains water supply (Option)

See the supplied installation instructions on the mains water supply.

Connecting the milk system

► Mounting the milk hose on the beverage outlet (see figure).
► Select a suitable milk nozzle (brown = for cooled milk; transparent = for uncooled milk) and
insert at the lower end of the milk hose.
► Insert the beverage outlet into the holder.
► Remove the grounds container out of the coffee machine.
► Move the beverage outlet to the lowest position.
► Clamp the milk hose into the guide intended for this purpose.
See "Operation" - "Filling and connecting" - "Milk" for filling milk.
If an external cooling unit is used: install the cooling unit as described in the operating instruc-
tions and route the milk hose from the coffee machine to the external cooling unit.

Commissioning program

When the coffee machine is started for the first time, the commissioning program is executed
automatically. It goes through the initial settings step by step. A detailed description of all steps
follows.
Press the button.
 The coffee machine switches on and the commissioning program begins.
► Follow the instructions on the touch screen.
Installation and commissioning