Deinstallation And Disposal - Schaerer Coffee Joy Manual De Instrucciones

Ocultar thumbs Ver también para Coffee Joy:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 153
www.schaerer.com
Display/ display text
Water filter: No
The machine heats up
"Espresso" beverage button
Your selection please
60
Parameter description
To set the use of a water filter:
► Set the use with
and
► Confirm by touching
Option 1: Input "no"
 The next commissioning step appears.
Option 2: If "yes" is set, the filter rinse is ex-
ecuted automatically.
► Place a container with a capacity of ca. 3 l
under the hot water outlet.
► Fill the drinking water container completely.
 After the filter rinse cycle is completed,
the next step is displayed.
The coffee machine begins heating up.
After heating, the coffee system is rinsed.
► Place a container under the beverage outlet.
 The rinse cycle takes ca. 40 sec.
A test brewing is performed at the end of the
commissioning program.
The
button flashes.
► Place a suitable container below the bever-
age outlet.
► Press the
button.
 The test brewing starts.
► Pour away the test beverage; do not drink it.
The coffee machine is now ready to use.

Deinstallation and disposal

The coffee machine must be disposed of correctly in conformity with local and legal regula-
tions.
► Contact your service partner.
Setting range
Yes/No
.
.
Installation and commissioning
Notes
If "Yes" is set, a filter rin-
se is then executed au-
tomatically.
The coffee system rinse
cleans and warms up all
pipes.
All settings that were
made now can be chan-
ged later.
See "Programming".
BASCJ_EN
V03 | 07.2015

Publicidad

Tabla de contenido
loading

Tabla de contenido