Cebora KINGSTAR 400 TS Manual De Instrucciones página 20

Ocultar thumbs Ver también para KINGSTAR 400 TS:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 66
3 START UP AND INSTALLATION
Make sure that the supply voltage matches the voltage
indicated on the specifications plate of the welding ma-
chine. When mounting a plug, make sure it has an ade-
quate capacity, and that the yellow/green conductor of
the power supply cable is connected to the earth pin.
The capacity of the overload cutout switch or fuses in-
stalled in series with the power supply must be equiva-
lent to the absorbed current I1 of the machine.
•Position the welding machine so as to allow the free cir-
culation of air inside and, as far as possible, to prevent
metal or other dusts from entering.
• The machine must be installed by professional person-
nel.
• All the connections must be performed in compliance
with applicable standards (IEC/CEI EN 60974-9) and with
accident-prevention laws.
• All power sources must be fitted with an axle and then
the rear wheels (fig. 2).
• For trolley-mounted machines, the pivoting system
must be mounted both on the wire feeder trolleys and
the power source. The small wheels provided together
with the screws and the torch support must be mounted
on the wire feeder trolley base, then arrange the trolley in
position. (See figure 3).
• Block one end of connection FA, by fixing the tab FB to
the machine base as shown in fig. 4.
• Connect all wiring on the back of the power source, as
shown in fig. 5
• Avoid coiling the connection to minimise inductive ef-
fects that could affect welding results.
• Connect the other end of connection FA to the wire fee-
der trolley as shown in fig. 6.
FOR TIG PROCESS
ONLY
20
SUPPORT CODE
5813315
Fig. 2
Fig. 3
FA
FB
Fig. 4

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Kingstar 520 ts372374

Tabla de contenido