KPS Multicheck6010 Manual De Usuario página 81

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Multicheck6010
Step 2
Connect test cable to the instrument and follow the connection diagram shown in figure
4.33 to perform a voltage and frequency measurement.
Step 3
Check the displayed warnings. The Voltage and Frequency test continually runs,
showing fluctuations as they occur, these results are shown on the display during
measurement.
Figure 4 34: Examples of voltage and frequency measurements
Displayed results:
U L-N
Voltage between phase and neutral conductors
U L-PE
Voltage between phase and protective conductors
U N-PE
Voltage between neutral and protective conductors
When testing three-phase system the following results are displayed:
U 1-2
Voltage between phases L1 and L2
U 1-3
Voltage between phases L1 and L3
U 2-3
Voltage between phases L2 and L3
Figure 4 33: Connection diagram
- 81 -
EN

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido