Motak PKU0155SA Manual De Instrucciones página 39

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Section 3
8.
Remove the ice damper.
Grasp ice damper and apply pressure toward the
left-hand mounting bracket.
Apply pressure to the right-hand mounting bracket
with thumb.
Pull ice damper forward when the right-hand ice
damper pin disengages.
Installation:
• Place ice damper pin in left-hand mounting
bracket and apply pressure toward the left-hand
mounting bracket.
• Apply pressure to the right-hand mounting bracket
with thumb.
• Push ice damper toward evaporator until
right-hand damper pin engages.
9.
Remove the Bin Door.
A. Grasp the rear of the bin door and pull bin door
forward approximately 5" (13 cm).
B. Slide the bin door to the rear while applying
upward pressure (the rear door pins will ride up
into the track slot and slide backward to the stop
tab).
C. While applying pressure against the bin door, pull
down on the rear of each bin door track until the
door pins clear the stop tabs.
D. Slide the rear door pins off the end and then
below the door track. Slide the bin door forward,
allowing the back of the door to lower into the
bin. Continue forward with the bin door until the
front pins bottom out in the track.
E. Lift the right side of door until the front pins clear
the track, then remove the door from the bin.
F. Remove rollers (4) from all door pins.
10. Continue with Step 6 on page 34.
Part Number: 000016426 Rev 00 08/2020
Cleaning and Sanitation
C
B
A
D
F
39

Publicidad

Tabla de contenido
loading

Productos relacionados para Motak PKU0155SA

Tabla de contenido