3 – I
C
NSTALLATION
ONFIGURATIONS
Possible positioning
According to the air duct lay-out, it is possible to rotate adequately the unit air inlets and outlets to give the following combinations,
each of them is a specific unit orientation to be specified when ordering.
Configurations shown on figure 3 are possible.
(1 = outside air, 2 = return air, 3 = supply air, 4 = exhaust air)
To modify the position of the suction inlets it is sufficient to exchange two panels each other, as shown on figure 4.
4 – T
RANSPORTATION
Packaging
Each unit is place on bench and protected with cellophane film; the protection must remain intact until the moment of
installation. The materials that are not mounted for technical reasons are supplied in fitted packing fixed externally or internally
to the unit.
Moving & transportation
For the lifting and transportation of the unit, use adequate equipment, according to the 89/391/CEE regulations and further
modifications.
Each individual unit weight is listed in this manual.
While moving, try to avoid rotation without control.
Checklist
Upon reception of the unit, we suggest that a complete control is carried out, to verify that the unit is intact and complete, and no
damage has been sustained during transport. Any eventual damage revealed must be communicated to the forwarding agent,
demonstrating the reserve clause within the transport documents, specifying the type of damage.
Storage
In case of long term storage, the apparatus must be kept free from dust, and away from areas susceptible to heat and vibration.
The Manufacturer declines any responsibility for any damage as a result of negligence or lack of protection from
atmospheric agents.