Prior To First Use - Beem Espresso Perfect Crema Plus Manual De Instrucciones

Ocultar thumbs Ver también para Espresso Perfect Crema Plus:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Prior to first use

Wipe the appliance and the accessories with a slightly damp
cloth.
Install the hot plate (1) and drip tray (9) with cup rest (10) in the
appliance.
Turn the selector switch (4) to the middle position
the mains plug into the plug socket.
Rinse out the water tank with clean water and fill the water tank
(16) up to the — MAX — mark as described in chapter Filling
the water tank.
Place a screen insert (6) without coffee powder into the screen
carrier (7) as described in chapter Installing the screen
insert.
Install the screen carrier (7) as described in chapter
the screen carrier.
Switch on the appliance as described in chapter
appliance ON/OFF.
Place a sufficiently large cup or bowl on the cup rest (10) under
the screen carrier (7).
Turn the selector switch (4) to position
through the appliance.
NOTE
Turn the selector switch (4) to the middle position
the collected water away when the cup or bowl is full.
Repeat the last steps until roughly half the contents of the water
tank has run through the machine.
Empty the drip tray as described in chapter
tray.
Clean the screen as described in chapter
the screen insert and install the screen carrier with empty
screen insert again.
BEEM - Elements of Lifestyle
During the first pumping process, unusual noises may be
heard. These noises will stop once the appliance is filled
with water.
Commissioning
and insert
Installing
Switching the
and allow water to run
and pour
Emptying the drip
Emptying/cleaning
EN
51

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

W1.001

Tabla de contenido