en
en
20 | 1 687 010 193 / 1 687 016 193 |
Contents English
1.
Symbols used
1.1
In the documentation
1.1.1
Warning notices -
Structure and meaning
1.1.2
Symbols in this documentation
1.2
On the product
2.
User information
2.1
Important notes
2.2
Safety instructions
2.3
Notes regarding the document
3.
Product description
3.1
Intended use
3.2
User group
3.3
Prerequisites
3.4
Scope of delivery
3.4.1
Accessory set 1 687 010 193
3.4.2
Accessory set 1 687 016 193
3.5
Component description
3.5.1
Clamping flange 1 685 720 369
3.5.2
Clamping support 1 688 030 207
3.5.3
Clamping support 1 688 030 209
3.5.4
Intermediate flange (Oldham)
1 685 702 094
3.5.5
Intermediate flange 1 685 702 109
3.5.6
Intermediate flange 1 685 702 096, ...
101, ... 111, ... 113, ... 115, ... 117
3.5.7
Adapter cables
3.5.8
Hose fitting 1 683 386 133
3.5.9
Quick-release coupling dummy plug
1 684 482 180
4.
Initial commissioning
4.1
Installing the clamping support 1 688 030 209 27
4.2
Preparing the hose fitting 1 683 386 133
4.3
Software installation
4.3.1
Installing the "EPS945" software
4.3.2
Installing the "EPS945-VDO" software 28
4.3.3
Installing CD-TestData
4.4
Releasing the VDO-TestData
|
1 689 989 337
2017-06-15
5.
Preparation for testing
5.1
Preparing the EPS 815 / EPS 708
21
5.1.1
Installing the drive coupling for VDO-CP
21
with cone shaft connection
5.1.2
Installing the intermediate flange for
21
VDO-CP with Oldham connection
21
5.2
Testing a VDO-CP
21
5.3
Clamping the VDO-CP
5.3.1
VDO-CP with cone shaft connection
21
5.3.2
For a VDO-CP with Oldham connection 32
21
5.4
Connecting the VDO-CP hydraulically
21
5.4.1
Connecting the test oil supply and test
21
oil return
5.4.2
Connecting the high-pressure supply 33
22
5.5
Connecting the VDO-CP electrically
22
22
6.
Test
22
6.1
Prior to testing
22
6.2
Starting and performing a test
22
23
7.
Spare and wearing parts
23
8.
Decommissioning
23
24
8.1
Change of location
24
8.2
Disposal and scrapping
25
25
26
26
26
26
27
27
27
28
28
28
29
29
29
30
31
31
31
33
33
33
34
34
34
35
35
35
35
Robert Bosch GmbH