Descargar Imprimir esta página

Prior To Testing; Starting And Performing A Test - Bosch 1 687 010 193 Manual Original

Juego de accesorios para bombas de alta presión vdo common rail

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 52
en
en
34 | 1 687 010 193 / 1 687 016 193 | Test
6.
Test
!
Before the start of testing, comply with the testing
and repair instructions for VDO-CP.
i
Information on how to test a VDO-CP can be found
in the online help of the "EPS945-VDO" software.
Further information on tests can be found in the
operating instructions of the CP4 supplementary
equipment set.
6.1

Prior to testing

Check the following points before switching on the
equipment:
R
Is the test equipment properly connected?
i
For a test on the EPS 815 in conjunction with
the CP4 supplementary equipment set, at least
six quantity measurement channels need to be
used with the KMA. At least four of these must be
connected to quantity measurement channels 1, 2,
5, 6, 9 or 10.
R
Are the protective devices (e. g. hood) complete and
in good working order?
R
Has the VDO-CP to be tested been properly clamped
and connected (hydraulically and electrically)?
R
Is the connection on the lubricating oil supply
sealed with a dummy plug or are the ends of the two
hose assemblies on the lubricating-oil supply unit
connected to one another (only on EPS 708)?
R
Is the connection on the high-pressure rail to the
distributor rail CRI 846H rail sealed with a dummy
plug?
|
1 689 989 337
2017-06-15
6.2

Starting and performing a test

1. Switch on the EPS.
2. Start the "EPS945-VDO" software.
3. In the "Component selection" dialog box, select
the VDO-CP to be tested in the "VDO-TestData"
database under <F2>.
4. Start test.
5. Select the automatic mode and perform the test.
6. When the test is complete, open the test protocol
and save it with <F4>.
"
Test ended.
Robert Bosch GmbH

Publicidad

loading

Este manual también es adecuado para:

1 687 016 193