Gf135 Commissioning - Brooks Instrument GF100 Serie Manual De Instrucciones

Tabla de contenido

Publicidad

Installation and Operation Manual
X-TMF-GF100-Series-MFC-eng
Part Number: 541B137AAG
April, 2017

2-21 GF135 Commissioning

Download the GF135 commissioning software, part number 805-C-026,
from the Brooks Instrument website. The software will need to be
downloaded onto a computer with a Windows
Necessary equipment:
• Computer that runs a Windows operating system
• Power (either DeviceNet or RS485) to the device or M8 EtherCAT power
• Need gas supply for pneumatic valve (90 ±3 psi)
• BB 485 to 232 converter or approved USB to 485 converter
• 9-pin to diagnostic cable
In order to ensure best results, commission the GF135 at operating
temperature and pressure on tool.
1. Start up the GF135 Commission Application and select a port. This will
bring up all of the devices on this port.
Section 2 Installation
GF100 Series
®
based operating system.
2-17

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Gf125 analog i/oGf125 digital i/oGf135 analog i/oGf121 analog i/o

Tabla de contenido