Installation and Operation Manual
X-TMF-GF100-Series-MFC-eng
Part Number: 541B137AAG
April, 2017
4. The user will be presented the option to override a few of the
parameters being tested prior to actual commissioning. Selecting "Yes" will
continue the process. By selecting "No" the commissioning process will
end.
5. After numerous checks are performed, the auto-volume will start. This
will take approximately 5 minutes to complete. The K1 setpoints will then
begin. This process will run for approximately 40-90 minutes.
Section 2 Installation
GF100 Series
2-19