Spare Part Replacement Process - Ambu aView 2 Advance Manual Del Usuario

Ocultar thumbs Ver también para aView 2 Advance:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 177
Operating and storage environment
Temperature
Relative humidity
Plugs
Between the power supply and the displaying unit
6 interchangeable types

1.7. Spare Part Replacement Process

This section specifies a spare part replacement process, which is in compliance with IEC 62353.
The organisation and personnel being responsible for the process should fulfil the requirements outlined in section 1.1.
Follow the process in Figure 2. to replace spare parts in the displaying unit.
Use the Trouble
Contact Ambu, if
Shooting guide in
you need further
the IFU
Chapter 2:
Clean and disinfect
Disassemble the
the displaying unit
displaying unit
8
Order and receive
relevant parts to be
assistance
replaced.
Chapter 4:
Chapter 3.3:
Replace the
relevant part(s) of
the displaying unit
Figure 2 Spare part replacement flow
10 - 40° C (50 - 104° F)
30 - 85%
Ø6.5mm DC jack connector
USA and Japan: Model NEMA 5 AC grounded power plug
Australian: AS3112, AC grounded
power plug
UK: BS1363, AC grounded power plug
European: CEE 7, AC grounded
power plug
Danish: 2-5a, AC grounded power plug
Swiss: Type J, AC grounded power plug
Chapter 4.5:
Chapter 5:
Assemble the
Test the displaying
displaying unit
unit
Follow the standard operating procedures
required by your organization
Chapter 2:
Clean and disinfect
the displaying unit

Publicidad

Tabla de contenido
loading

Tabla de contenido