Descargar Imprimir esta página

Prepare The Site - Kohler K-528-K1 Instrucciones De Instalación

Ocultar thumbs Ver también para K-528-K1:

Publicidad

Idiomas disponibles

Idiomas disponibles

2. Prepare the Site

2-3/4"
(70 mm)
Min
Drip Loop
NOTICE: Do not install the valve in any location where the temperature may exceed 104°F (40°C). The valve and its
integrated power supply are rated to operate in temperatures up to 104°F (40°C).
NOTE: Horizontal installation within a stud cavity is shown. The valve can also be mounted vertically or mounted to a
horizontal surface. Refer to the "Mounting Configurations" section.
NOTE: This product is designed to fit within a minimum 14-1/2" (368 mm) 2x4 stud cavity.
Install adequate bracing for mounting the valve.
Notch the bracing as needed to accommodate the inlets and outlets.
Install a 120 V GFCI electrical outlet within the stud framing, near the valve. Locate the electrical outlet above the
valve.
1145587-2-E
Board Mount
14-1/2"
(368 mm) Min
9-1/2"
(241 mm)
Position the outlet
higher than
the valve.
Notch bottom brace.
8
Cross Brace Mount
14-1/2"
(368 mm) Min
11-5/8"
(295 mm)
12-1/2"
(318 mm)
Kohler Co.

Publicidad

loading