Descargar Imprimir esta página

SICE S 1000 Manual De Instrucciones página 147

Ocultar thumbs Ver también para S 1000:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

- The SAVE button
N.B.: The large arrows increase or decrease the size by one inch, at each pressure
step: The small arrows increase or decrease the size by one tenth of an inch each
time they are pressed.
5.4b Bead breaking - Demounting
CAUTION!
KEEP YOUR HANDS
AND OTHER BODY
PARTS AWAY FROM
MOVING PARTS
The air inside the tyre must be fully bled before proceeding. Never attempt to break the
bead until all air is removed from the tire. Failure to remove all air from tire may result
in injury to operator, or damage to equipment, tire, or wheel.
CAUTION!
The machine carries out 3 phases in sequence: top
bead breaking (sequence 2), bottom bead breaking
(sequence 3) and tyre demounting (sequence 4). If
necessary, the automatic sequence can be interrupted
at any moment by pressing the stop button (Fig. 22).
Subsequently the individual phase can be repeated or
you can proceed in manual mode.
N.B.: before beginning the bead breaking operation,
position the infl ation valve at 3 o'clock (Fig. 22a). During
the various work phases, the machine automatically di-
rects the valve position to reduce the risk of damaging it.
CAUTION!
Always verify the presence and size of the sensor on
the infl ation valve in order to assess the possibility of
operating in automatic mode. Alternatively, you can
proceed manually.
User manual S 1000
can be used as an alternative to the central button of Phase 1.
CAUTION!
KEEP FEET CLEAR
OF THE BEAD
BREAKER AND
LIFTER
CAUTION!
CAUTION!
DO NOT PER-
FORM BEAD
BREAKING IF
THERE IS AIR
IN THE TYRE
22
22a
147
UK

Publicidad

loading