The packaging contains all the
information needed to carry out the
loading and unloading operations.
During transport, make sure the load is
properly secured to the mean of transport
to avoid unexpected displacements.
When transporting the uncovered
engine by road, use the lifting points
provided to secure it steadily and prevent
components from being damaged.
UNPACKING
Follow the procedure below.
1 - Remove the cover of the packaging.
The packaging includes a bag with all
the relevant technical documentation and
standard components.
2 - While unpacking, make sure the
components are intact and their quantity
is correct.
3 - Place the lifting device as shown in the
figure.
4 - Loosen the screws (A) and
disassemble the side supports (B).
5 - Move the engine to the installation
area.
If necessary, keep the material in case
you need to pack the engine in the future.
IMPORTANT
In case of any damage or missing
part, contact immediately the engine
manufacturer to agree the procedure to
be adopted.
The packaging material must be
suitably disposed of in compliance
with the legislation in force.
English
Screw (A)
Support (B)
21
R754EU6E
GB
42432110F