3
Technical description
3.1
Completeness
Transportation damage
Storage, transport
Packaging material
SmartConnect
Operating manual
Scope of delivery
1 SmartConnect.
1 tool (terminal opener)
|
1 device key
|
4 sealing plugs
|
2 sealing rings, M32.
|
1 CAN distributor.
2 bus connector mounting rails (attached)
|
2 metric EMC M25 screw connections
|
2 reducers for metric EMC screw connections
|
6 5-pin plugs
|
2 terminating resistors (R = 120
|
Operating manual.
Optional
1 power supply for Conergy or Voltwerk 2-axis tracking systems.
4 metric EMC M25 screw connections
|
1 reducer for metric EMC screw connection.
|
1 connection cable for power supply and CAN distributor (pre-
|
assembled).
1 mains cable, 230 V for auxiliary power supply.
|
1 3-pin connector for the 230 V input.
|
1 4-pin connector for the DC output.
|
Check the completeness of the delivery immediately on arrival. If the
delivery is not complete, contact the manufacturer (contact details on the
back of the operating manual).
If you establish that the delivery has been damaged in transit, contact the
manufacturer (contact details on the back of the operating manual).
The device should be stored at an ambient temperature between –20 °C
and +50 °C. The device packaging is not weatherproof. Only store the
packaged device in enclosed, dry spaces, which are free of aggressive or
corrosive gases, vapours or dust.
Take the packaging material to an environmentally-friendly recycling
facility.
3 Technical description
11