Descargar Imprimir esta página

SKYLOTEC SKYVEST Instrucciones De Uso página 14

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

5.) COMMISSIONING
Before initial commissioning
We recommend registering in our database before using it for the first
time. Inspection reports can be archived and viewed here. All necessary
data can be called up at any time on various end devices. The Homebase
also reminds you of the inspection at the necessary intervals.
You can find more information about the homebase at
https://www.skylotec.com/eu_de/industrie/homebase/
Please follow the link to register:
https://app.myhomebase.de/login
5.1) Fitting the SKYVEST
When using the SKYVEST as a high-visibility vest in accordance
with EN ISO 20471, it must be ensured that the inner fabric extension
(background and reflective material) is connected to the opposite
side of the vest before the buckles are fastened.
LED colour
Continuous red light System is not
14
MAT-BA-0229-03_20240305.indd 14
MAT-BA-0229-03_20240305.indd 14
Make sure that all 3 buckles
are closed. Adjust the length of
the fastening straps so that
there is a finger's width of air
between the strap and the
body.
Close the zip to the electronics.
Meaning
ready for use
Remark
See troubleshooting or
contact the manufac-
turer
26.03.2024 11:09:21
26.03.2024 11:09:21

Publicidad

loading

Este manual también es adecuado para:

Opus 2.0