Electrical Circuit Diagram - Nussbaum TOP LIFT 2.35 TS Instrucciones De Servicio

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

3.6

Electrical circuit diagram

Grounding according to local regulations
Before commissioning check whether the nominal
motor current matches the motor protection relay.
Check all terminal points for proper connection
and that all contact screws are tight.
Before commissioning, check all wiring and controls
for proper function. Do not permit commissioning
from the unauthorised side.
These plans were generated on a CAD system. To
keep plans to the current state, we ask that you re-
quest Nussbaum to make the changes.
These circuit diagrams are intellectual property.
They may not be given to third parties or repro-
duced without our permission!
Rights to make changes are retained.
Circuit diagram and switch documents
Circuit diagrams were made to the best of our
knowledge.
No guarantee is made for the accuracy of enclosed
circuit diagrams and switch plans contained in this
document. This is particularly relevant for switches
that were completed by us according to third party
plans. This was done by us from purchaser provided
manufacturer documentation.
Functional test of switch systems
Circuit diagrams are not standard documents.
When checking the control cabinet at the facto-
ry, field devices such as sensors, thermostats and
motors cannot be included. For this reason, even
with careful inspection, functional and switch errors
cannot always be prevented.
Deficiencies are removed within the scope of
guarantee during commissioning. During commis-
sioning, if our services are not used, then no defi-
ciency liability is accepted. Rework, including in-
forming of circuit diagrams of switch systems not
commissioned by us are therefore only done to an
invoice according to our service terms and condi-
tions. Costs for rework by third parties cannot be
hounored.
OPI_TOP LIFT 2.35 TS TSK TSA - HYMAX INGROUND 2.35 R B P_V1.1_DE-EN-FR-ES-IT
Safety inspection and safety measures
The control cabinet has been produced, set up
and inspected according to recognised technolo-
gy rules according to VDE0100/0113 and accident
prevention regulation VBG4 (electrical systems and
equipment)
The following tests were done:
• Voltage test and/or insulation test of the control
cabinet according to VDE0100/5.73
• Inspection of effectiveness of the safety mea-
sures used for indirect contact according to
VDE0100g/7.75 para. 22
• Functional test and part test according to
VDE560/11.87
Implemented safety measures:
• Protection against direct contact according to
VDE0100/5.73. Para. 4
• Protection against indirect contact according to
VDE0100/5.73. Para. 5
i
See Section 3.6 in the Ger-
man version for the diagram.