Nussbaum TOP LIFT 2.35 TS Instrucciones De Servicio página 78

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Time frame
Maintenance
type position
12
1
11
2
10
1 x / 12
9
3
4
8
5
7
6
12
1
11
2
10
1 x / 12
9
3
4
8
5
7
6
12
11
1
2
10
1 x / 12
9
3
4
8
5
7
6
12
1
11
2
10
1 x / 12
9
3
4
8
5
7
6
78
Check electrical components for function and condition.
• Plug
• Operating lever with button switch
• During assembly and maintenance always check the condition of
electrical lines. All cables and lines must be secured so they cannot
be crushed, kinked or contact any moving assembly.
Optional energy set:
• Electrical socket
• Pneumatic connection
Check for condition and function.
Check all fastening screws and anchors with a torque wrench.
Fastening class 8.8
0.08*
0.12**
0.14***
M8
17.9
23.1
25.3
M10
36
46
51
M12
61
80
87
M16
147
194
214
M20
297
391
430
M24
512
675
743
Fastening class 10.9
0.08*
0.12**
0.14***
M8
26.2
34
M10
53
68
75
M12
90
117
128
M16
216
285
314
M20
423
557
615
M24
730
960
1060
*
Lubricated slide friction number 0.8 MoS2
**
Lightly oiled slide friction number 0.12
***
Ensured slide friction number 0.14 screw with micro-encapsulated plastic
Check the paint:
• Check the powder coating and improve if required.
Damage by external influences is to be treated immediately after
detection. If these points are not treated, infiltration of deposits of all
kinds can cause wide-ranging and permanent damage.
These points are to be lightly sanded (120 grit), cleaned and
degreased. Afterwards, rework with a suitable touch up paint (note
the RAL No.).
• Check galvanised surfaces, touch up as needed.
White rust is fostered by permanent humidity, poor ventilation. The
affected areas can be treated by using a sanding cloth (A 280 grit).
If required, the parts are to be treated with a suitable, resistant mate-
rial (paint etc). Check the RAL colour selection.
• Rust is brought out by mechanical damage, wear, aggressive de-
posits (de-icing salt, leaking operating fluids) cleaning that is not
done or incomplete.
The affected areas can be treated by using a sanding cloth (A 280
grit). If required, post-treat the areas with a resistant material (paint
etc.).
OPI_TOP LIFT 2.35 TS TSK TSA - HYMAX INGROUND 2.35 R B P_V1.1_DE-EN-FR-ES-IT
Maintenance plan
37.2

Publicidad

Tabla de contenido
loading

Tabla de contenido