Start-up
Settings
Diffusers and injectors
34
Natural gas
Propane gas
05/2006 - Art. Nr. 13 013 500B
Factory setting
5 slots open to the outside (arrow) +1 slot
inside on 1 diffuser A according to shutter E
position.
Fixing turbulator on all three diffusers A
and B with 3 unpierced screws M5x6.
5 slots open to the outside (arrow) and
0 slot inside on 5 diffusers B and BF
according to shutter E position.
Fixing turbulator on all three diffusers
BF with 3 pierced screws F M5x6 - Ø
3 (front injection).
Recommended setting
3 slots open to the outside (arrow) +1
slot inside on 3 diffusers A according to
shutter E position.
Fixing turbulator on all three diffusers
A with 3 unpierced screws M5x6.
3 slots open to the outside (arrow) and
0 slot inside on 3 diffusers BF
according to shutter E position.
Fixing turbulator on all three diffusers
BF with 3 pierced screws F M5x6 - Ø
3 (front injection).