ASSEMBLY INSTRUCTIONS
7. Measure approximately 6 to 9 in. of lead wire
from the top of the downrod assembly (C),
in. from the end of each lead wire.
WARNING
To avoid possible electrical shock, be sure electricity is turned off at the main fuse box before
hanging.
Note: If you are not sure if the outlet box is grounded, contact a licensed electrician for advice.
WARNING
The fan must hang with at least 7 ft. of clearance from the floor to blades.
8. Securely attach the hanger bracket (B) to the
outlet box (not included) using the outlet box
screws and washers supplied with the outlet
box.
WARNING
The outlet box must be securely anchored.
Hanger bracket (B) must seat firmly against
outlet box. If the outlet box is recessed, remove
wallboard until hanger bracket (B) contacts box.
securely attached, the fan could wobble or fall.
7
8
B
8
C