Grounding monitor
Electric shock, short
DANGER
circuit, fire, explosion
Using the charger without active ground monitoring
can cause electric shocks, short circuits, fires,
explosions or burns.
e The charger must preferably be operated in
earthed power grids.
e Only deactivate ground monitoring in non-
earthed power grids.
e Do not deactivate ground monitoring in earthed
power grids.
f Please see chapter "Activating ground
monitoring" on page 13.
Deactivating ground monitoring
Fig. 11: Buttons and lights for deactivating ground
monitoring
b The
C
button lights up red.
HARGE STATUS
b The
H
V
and
light indicators light up
OUSE
EHICLE
red.
b Ground monitoring has stopped the charging
process or is preventing it from starting.
1. Simultaneously press and hold the
M
button and the
STATUS
ULTIFUNCTION BUTTON
C
At the same time, the
HARGER
flashes white.
2. Release both buttons as soon as the
light indicator stops flashing.
3. After 2 seconds (this time starts as soon as
flashing stops), simultaneously press both
buttons again and hold for at least 5 seconds.
At the same time, the
flashes white.
Ground monitoring is deactivated when the
H
OUSE CONNECTION
light up yellow. When charging, the
button also pulsates green.
STATUS
Ground monitoring remains deactivated for
subsequent charging sessions as well.
Information
For easier charger operation, cover the buttons fully
with your fingers and apply uniform pressure.
Activating ground monitoring
If you are operating the charger in an earthed power
grid, activate ground monitoring.
e Simultaneously press the
and the
MULTIFUNCTION BUTTON
least 5 seconds.
At the same time, the
flashes white.
Ground monitoring can also be activated via the web
application:
f For notes on the web application, see the
instructions at https://www.porsche.com/
international/aboutporsche/e-performance/
help-and-contact/.
For other languages, select the desired country
C
HARGE
version of the website.
.
light indicator
C
HARGER
Energy manager
The energy manager coordinates the energy
consumers and suppliers in the home.
C
light indicator
HARGER
To ensure the energy manager takes over control
of charging, the charger and energy manager must
be connected to one another via a PowerLine
V
and
light indicators
EHICLE
Communication (PLC) network connection.
C
HARGE
The existing power grid is used to establish a local
network for data transfer.
Adding an energy manager
The energy manager can be connected to a PLC
network in two ways:
– The energy manager is registered as a client in
a PLC network (application option 3).
– Direct PLC communication between the charger
and energy manager (DHCP server) (application
option 4).
f For further information on application options,
Please see chapter "Possible uses" on page 6.
C
button
HARGE STATUS
Connection between the charger and the energy
, and hold for at
manager is achieved directly on the charger and in
the web application of the energy manager.
C
light indicator
HARGER
Operating instructions
US
FC
ESM
PTB
TR
RU
UK
VIE
HE
AR
JPN
KOR
CHT
THA
13