Descargar Imprimir esta página

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 367
EdmoLift Products Manual
Operating the WP Work Positioner
Raising of the load carrier
1.
Raising and lowering is controlled from the control unit with 'deadman'
operation. It is mounted on a spiral cable and should be placed on the machine
handle when not in use.For greatest convenience, the handle is designed for
various hand settings and is height adjustable (not WP 200).
Lowering of the load carrier
2.
When lowering the load carrier ensure there is no risk of injuring persons. Pay
special attention so that the load carrier does not reach over obstacles on which
it can become caught.

Safety functions

3.
The rear wheels are fitted with parking brakes to prevent unintentional movement. Lifting with excessive load weight
is prevented by means of a built-in electromechanical overload protection device. This comprises a limit switch, which
controls the chain tension.
An electronic current-overload protection prevents overloading of the motor, e.g. in an overload situation or when it is
operated for too long.
Actions following use
4.
After final operation the load carrier should be lowered to the ground and the operating power cut off by means of the
main switch.
Connect the charger cable to the mains supply 220/240 V AC. Well charged batteries enable the machine to operate
efficiently throughout the entire work shift.
When there is risk of unauthorized use the machine should be located so that unauthorized persons do not have
access to the machine, or it should be locked to the building or any other suitable object by means of a locking chain,
cable or similar (not included).
Operating the TZ Lift Trolley
5
Charger cable: The charger plug is to be connected to a 220/240V AC socket. The charger automatically controls the
charging current and switches off automatically when the batteries are fully charged.
The "Accu-CF" batteries are maintenance free. They are full, enclosed and require no inspections or water refills. It is
important, however, to keep the batteries clean and dry.
Charging should be undertaken as frequently as possible. We recommend that the batteries are charged after
each working shift.
Raising the platform
Hold button down to raise the platform. When released, raising stops.
Lowering the platform
Ensure there is no risk of injury to persons or objects when the platform is lowered. Take special care that the platform
does not extend over objects and become jammed.
Lowering is by means of pressing the lowering handle, which will open the lowering valve by means of a cable.
Copyright © EdmoLift AB 2004-2007
All rights reserved. No part of this publication may be reproduced, stored in a retrie-
36
val system, or transmitted in any form or by any means, electronic, mechanical,
photocopying, recording or otherwise without the permission of the publisher.
2005-02-01
EdmoLift AB
Jägaregatan 11
S-871 42 HÄRNÖSAND, SWEDEN
85921 GB
Up
Down
Tfn. +46 (0)611-83 780
Fax. +46 (0)611-51 15 80
info@edmolift.se

Publicidad

loading