3.3
Connectors
3.4 Technical Specifi cations
Dimensions (L x W x H)
Weight
Power
Input Voltage
Input Frequency
Ingress Protection
Welding Report Memory
Interface
4
Operation
Make sure all connectors are tight in their sockets and note
that operation of butt-welding machines on a worksite is
only acceptable if the power supply has earth-leakage circuit
Important
breakers.
After connecting the power supply cord to the mains power supply or
a generator, turn the unit on at the On/Off switch.
It has to be ensured that the voltage of the power source the
machine is connected to corresponds to the rated voltage of
the machine. Also the following has to be respected when
using extension cables:
Caution
wire section 1.5 mm² = max. 20 m long
wire section 2.5 mm² = max. 75 m long
wire section 4.0 mm² = max. 100 m long
4.1
Switching the Data Logger on and Setting its Basic
Parameters
After the machine was switched on, Display 1 shows on the screen.
The system will then automatically start the auto-test process to check
the sensors and the system clock and to determine the number of free
welding reports. This test can be bypassed by holding down the STOP/
RESET key when Display 1 is showing.
8
EN
approx. 240 x 120 x 185 mm
3.0 kg
22 watts
230 V, 110 V - 240 V
50 Hz / 60 Hz
IP 54
10 000 joints
USB A
SPG 2.0 User's Manual
O . M . I . S . A . S r l
Via Verga 9/11
20845 Sovico (MB), Italy
On/Off Switch
Ambient Temperature Sensor
Pressure Sensor Connector
Buzzer
USB Port
Temperature Sensor Connector
Scanner Connector
Power Supply Cord
********************
O.M.I.S.A.
*
SPG 2.0
*
********************
Display 1
Version June 2020
*
*