Descargar Imprimir esta página

Furius FW125 Manual De Usuario página 63

Publicidad

Idiomas disponibles

Idiomas disponibles

1
YEAR
WARRANTY
9. INSTALLATION OF THE TIG PROCESS
1. Turn on the computer
2. Use the process selection button to switch between TIG process.
2. Select the current according to the filler diameter to be melted.
3. Cable connection the TIG torch must be connected to the connector with negative polarity and the work
clamp with positive polarity.
GAS installation
IN TIG the gas must be connected directly to the torch and the start of the arc is given by Lift Arc. The gas
used must be Argon or Helium, the cylinder must have a pressure regulator and a gas flow of 16 to 20 l / m or
32 to 40 CFH is recommended.
IGNITION TIG (SCRAP)
1. PLACE THE TORCH IN
POSITION
2. LIGHTLY TOUCH THE
TUGNSTEN AGAINST THE
PART TO BE WELDED
19

Publicidad

loading

Este manual también es adecuado para:

Flex125