John Bean B 2000P Manual Do Operador página 184

Tabla de contenido

Publicidad

7-24
8
7-25
8
7-26
7-27
7-28
184
Operation
Fig. 7-24 OPTIMISATION "2"
START is signalled on the screen.
Spinn the wheel.
A compensation run is performed.
The screen "3" as shown in Fig. 7-25 is displayed.
Fig. 7-25 OPTIMISATION "3"
Mount the tyre correctly on the rim and infl ate
to specifi ed infl ation pressure (make sure the
mounting guide rim of the tyre is correctly
seated).
Confi rm by pressing key 8.
The OPTIMISATION "4" screen (Fig. 7-26) is
displayed.
Fig. 7-26 OPTIMISATION "4"
(fi rst measuring run of tyre/rim assembly)
Clamp the wheel on the balancer.
Readjust the wheel such that the valve is
exactly perpendicular to and above the main
shaft.
Enter the valve position by pressing key 8.
The OPTIMISATION "5" screen (Fig. 7-27) is displayed.
Fig. 7-27 OPTIMISATION "5"
START is signalled on the screen.
Perform the measuring run.
A measuring run is performed.
The OPTIMISATION "6" screen (Fig.7-28) is displayed.
..
..........
_

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido