SICE FIT LINE 32 Manual De Instrucciones página 111

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

- Insert and position the bead lifting tool on the mounting
vertical slide (fig.24).When working with alloy wheels
or wheels with delicate paintwork, you are advised to
remove the bead lifting tool before proceeding with the
demounting.
Avoid unintended lever movement and injury. Grip the lever firmly when using.
- Force part of the upper bead into the rim well by
pushing down on the side wall of the tyre nearest
to the operator (Fig.25a).
User Manual
FITLINE 32 - 32 2V - 32 GP - 32 GP 2V
WARNING
- Lift the upper bead above the rear part of the de-
mounting head (fig.25)
25
24
UK
25a
111

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Fit line 32 2vFit line 32 gpFit line 32 gp 2v

Tabla de contenido